Intertraffic 2024
Intertraffic 2024 ECOexperts will present latest developments from 16 to 19 April 2024 in Amsterdam Intertraffic Amsterdam
Intertraffic 2024 ECOexperts will present latest developments from 16 to 19 April 2024 in Amsterdam Intertraffic Amsterdam
Electrotechnical renovation of the S6 Semmering expressway in the section Gloggnitz – Maria Schutz. The highway will be renovated between km 21.40 and 23.40. The refurbishment affects parts of the open street and the two tunnels Grasberg and Eselstein. Scope of delivery electrical cabinets traffic control traffic data acquisition network infrastructure control and SADA system…
The Saalbach bypass tunnel is a single-tube, approx. 525 m long road tunnel which is used in oncoming traffic. The tunnel has an additional connected tunnel with a length of 83 m, which represents the entrance to the center of the car park or ends immediately afterwards at the west portal. Scope of delivery Software…
The project comprises the construction of the electromechanical equipment for the new area of the A5 between km 23,728 and km 48.460. Road safety through control: The systematic, random check of road users on the ASFINAG route network make a significant contribution to increasing road safety. Scope of delivery Distributions Traffic control Traffic data acquisition…